M2/M3 BFV: HULL POWER DIST SYSTEM - OD1606 - LESSON 1/TASK 1
FIGURE 26.
REMOVING LEADS 1W1E5 AND
1W1E3 FROM THE TWO TERMINALS
This completes the procedures used to remove the master battery
switch relay.
In the paragraphs that follow, the procedures for
installing the master battery switch relay will be discussed. While
reading through these paragraphs, refer to figures 26 thru 29 on
pages 30 through 32.
30