M2/M3 BFV: HULL POWER DIST SYSTEM - OD1606 - LESSON 1/TASK 1
FIGURE 31.
REMOVING LEAD 1W10+ FROM
THE POSITIVE TERMINAL OF
THE VOLTS GAGE.
FIGURE 32.
THE INSTRUMENT PANEL.
Begin installation of the gage by pushing the volt gage through the
instrument panel until the two posts are in the two brackets.
Now
install the two nuts on the two posts on the gage.
Position lead
1W10+ on the positive terminal and secure with a lock washer and nut.
Then position lead 1W10-M1+
34