MAINTENANCE OF THE M113 PER CARRIER - OD1601 LESSON 2/TASK 2
FIGURE 13.
test points. Continuity should be present and is a normal condition. Continuity
tests check for a break in a circuit component (such as a switch or electrical
cable).
identical for all three types of multimeters.
a Before making a test for continuity, the
multimeter
must
be
mechanically zeroed. Then, it must be electrically zeroed.
CAUTION
Failure to perform the following step may result in damage
b Place the MASTER BATTERY switch in the OFF position. Disconnect the
circuit that is being tested. To be safe, disconnect the battery ground strap.
c Connect the meter probes to both terminals of the circuit being
tested.
When testing a switch or a component that contains a
36