Figure 33.
Lead 10 Test Point.
Figure 34.
Lead AAA Test Point.
o Disconnect lead AAB from the conveyor control switch, place the multimeter
red probe in the switch, and ground the black probe (Fig. 35).
Set the
MASTER switch to the ON position, the conveyor control switch to the OUT
position, and test for voltage.
If no voltage is indicated, replace the
conveyor control switch. However, the multimeter indicated voltage, set the
MASTER switch to the OFF position, reconnect lead AAB to the conveyor control
switch, and continue to troubleshoot the system.
39
OD1737