d. Testing of the test set is accomplished by organizational maintenance
personnel utilizing the procedures listed below, the schematic wiring diagram (fig
13), and the troubleshooting chart (fig 14). Satisfactory completion of the
procedures insures proper operation of the vest set.
(1) Place all test set panel ON-OFF switches in OFF positions.
(2) Connect the test set to a 120-volt, AC, 60-hertz, power supply.
Figure 6.
Distributor tester.
OS 010, 8-P10