Figure 1-67.
Cooler Inlet and Outlet Tube Assembly
(Right Side).
You have completed the installation of the forward engine module and
accessory gearbox. To prepare the powerpack for installation in the
tank, you must service the powerpack according to LO 9-2350-264-12,
perform
the
inlet
guide
vane/power
turbine
stator
(IGV/PTS)
adjustments, and ground hop the powerpack (TM 9-2350-264-20-1).
This concludes the lesson.
Next you perform a Practice Exercise to
prepare you for the examination of this lesson.
60
OD1708