LESSON
REMOVAL OF THE ACCESSORY GEARBOX AND FORWARD ENGINE MODULE
OF THE AGT TURBINE ENGINE
LEARNING OBJECTIVE
Actions:
The student will describe the steps and procedures
necessary to remove the accessory gearbox and forward
engine module from the AGT turbine engine in accordance
with TM 9-2835-255-34, TM 9-2350-264-20-1-3, TM 9-235-264-
20-1-4, and TM 9-235-264-20-1-5.
Conditions:
Given the subcourse text.
Standards:
The description of the steps and procedures necessary to
remove the accessory gearbox and forward engine module from
the AGT turbine engine will be in accordance with TM
9-2835-255-34, TM 9-2350-264-20-1-3, TM 9-235-264-20-1-4,
and TM 9-235-264-20-1-5.
INTRODUCTION
As an Army maintenance provider, you are dedicated to giving the M1A1 series
tank the best possible maintenance.
Through Preventive Maintenance Checks
and Services (PMCS) and scheduled maintenance, you keep the tank
operational. This ensures that you and your unit can perform your mission
on today's battlefield; you help maintain unit readiness at a high level.
As a Track Vehicle Repairer (63H20), the removal procedures for the
accessory gearbox and forward engine module are critical tasks that you must
perform to keep the M1A1 Abrams tank operational. For you to perform these
critical tasks correctly, you must understand and perform removal procedures
for the accessory gearbox and forward engine module as described in this
lesson.
PART A - REMOVAL OF THE ACCESSORY GEARBOX FROM
THE AGT TURBINE ENGINE
1.
Tools.
Prior to starting any portion of the removal procedures, you must have the
necessary tools on-hand at the work site:
1
OD1707