M2/M3 BRADLEY FIGHTING VEHICLE: TURRET - OD1609 LESSON 3/TASK 3
(c)
Install right turret floor plate and remove step turret floor plate (TM
9-2350-252-20-2-2, page 4-22).
Manually traverse the turret to 1600 mils (TM 9-
2350-252-10-2). Check connections 2W2P1 to 2A7J3 and 1W5P2 to 2A7J4.
(d)
Install step turret floor plate (TM 9-2350-252-20-2-2, page 4-22).
Manually traverse turret to 3700 mils (TM 9-2350-252-10-2).
Inspect connection
2W306P7 to 2A200J7 (figure 32).
FIGURE 32.
CONNECTION 2W306P7/2A200J7.
(e)
Manually traverse turret
to
3200
mils
(TM
9-2350-252-10-2).
Check
connection 2W301P1 to 2A200J1.
(3)
Repeating Test 2620.
When all of the connections have been checked and
tightened, test 2620 should be repeated in hopes of obtaining a NO FAULTS FOUND
condition.
Before repeating the test, it may be necessary to connect some
components disconnected during testing (i.e., if disconnection was required by the
SETCOM instructions). If required, manually traverse the turret to 3200 mils (TM
9-2350-252-10-2), install plug 2W202P1 on jack 2A200J4, manually traverse the
turret to 6400 mils, and install the cap on the diagnostic panel jack J3.
Whenever a corrective action has been taken in the test and inspection procedure,
test 2620 should be
140