Remove the two clamp nuts (2) and spread the clamps apart
(3)(fig. 1-11).
Hold the tube (1) and slide the clamps (3) on the tube (1);
lift the tube and clamps out, and remove the clamps and
metal seal rings (4) from the tube (fig. 1-11).
Inspect the parts for damage and replace as required.
Figure 1-10.
Steering Control Rod and Plenum Seal Hose.
Figure 1-11.
Prioritization Valve Tube Assembly.
12
OD1709