Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Ordnance Documents and other related manuals
>
> Figure 47. Continuity Test, Lead AAA, Socket A.
Figure 46. Continuity Test Lead AAB
Figure 49. Solenoid Resistance Test Point
Introduction, Maintenance, And Troubleshooting of the Primary/Backup Hydraulic System
Page Navigation
46
47
48
49
50
51
52
53
54
55
56
Figure 47.
Continuity Test
,
Lead
AAA,
Socket A.
Figure 48.
Continuity Test
,
Lead
AAB,
Socket A.
o
Measure
the
resistance
of the conveyor directional control valve
solenoid
between the connector A and ground
51
OD1703