• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > Ordnance Documents and other related manuals > > Test 2650 (Turret Traverse)
Figure 25. Connections 2w307p8/2A200j08
Figure 27. Connection 2w4p3/2A3J2

M2/M3 Bradley Fighting Vehicle: Turret
Page Navigation
  124    125    126    127    128  129  130    131    132    133    134  

M2/M3 BRADLEY FIGHTING VEHICLE: TURRET - OD1609 LESSON 3/TASK 2
FIGURE 26.
CONNECTION 2W308P9/2A200J9.
(3)
Repeating Test 2525.
When all connections are tight, manually traverse
the turret to 3200 mils (TM 9-2350-252-10-2).  Install plug 2W202P1 to jack 2W200J4
and install the cap on diagnostic panel jack J3, if earlier test procedure steps
(i.e., SETCOM messages, etc.) required their removal.
Then manually traverse the
turret to 6400 mils (TM 9-2350-252-10-2).
Whenever a corrective action has been
taken in the test and inspection procedure, test 2525 should be performed again to
ensure the symptom has been corrected.  This should be continued until a NO FAULTS
FOUND condition exists.  When a NO FAULTS FOUND message is displayed on the SETCOM
during a repeat test, and the symptom has been corrected, perform the follow-on
procedures listed under b(3) steps 1 through 4, on page 126.
3.
Test 2650 (Turret Traverse)
Test 2650 tests the power mode traverse, mechanical brake, transient response, high
rate traverse, commander's override, azimuth indicators and interlocks, and turret
traverse friction.  It is performed using the STE test set.
129






Western Governors University

< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.