Home > Ordnance Documents and other related manuals > > Procedural Steps for Removal of the Traverse Drive Gearbox
Task 1. Describe the Procedures for Replacing the Turret Tranverse Gearbox.
Removal of the Traverse Drive Motor.

M2/M3 Bradley Fighting Vehicle: Turret
Page Navigation
  63    64    65    66    67  68  69    70    71    72    73  

M2/M3 BRADLEY FIGHTING VEHICLE: TURRET - OD1609 LESSON 2/TASK 1
(2)
Materials/Parts: Grease, lockwasher, traverse drive gearbox, and cotter
pin.
(3)
Personnel Required: Bradley fighting vehicle turret mechanic and helper.
(4)
References: TM 9-2350-252-10-1 and TM 9-2350-252-10-2.
(5)
Equipment Conditions.
Engine stopped and turret shut down
b.
Procedural Steps for Removal of the Traverse Drive Gearbox.  Four preliminary
procedures must be completed before the traverse drive gearbox can be removed.
These procedures are described in subparagraphs 2b(1) through 2b(4) below.
(1)
Removal of the Gunner's Handstation.
Step 1.
Remove plug 2W302P1 from jack 2A205J1 behind the gunner's handstation.
CAUTION
Equipment may get damaged if screws are removed without
supporting the handstation.
Support the handstation before screws are removed.
Step 2.
Remove  the  gunner's  handstation  from  the  bracket
by
removing
four
locknuts, screws, and eight washers.  Discard the locknuts.
(2)
Removal of the Gunner's Turret Position Indicator.
Step 1.
Remove  the  defogger  switch  box  assembly.
These
procedures,
when
needed, can be found on page 5-103 of TM 9-2350-252-20-2-2.
Step 2.
Remove four plugs from four jacks on the integrated sight unit (ISU) as
follows:
(a)
2W103P3 from 2A1001J02
(b)
2W103P4 from 2A1001J03
(c)
2W101P1 from 2A1001J01
68






Western Governors University

< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.