• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > Ordnance Documents and other related manuals > > Preparing for Test 2700
Test 2700 (25mm and 7.62mm Guns)
Running Test 2700.

M2/M3 Bradley Fighting Vehicle: Turret
Page Navigation
  141    142    143    144    145  146  147    148    149    150    151  

M2/M3 BRADLEY FIGHTING VEHICLE: TURRET - OD1609 LESSON 3/TASK 3
NOTE
During  the  test  procedure,  the  STE  set  communicator
(SETCOM)  may  display  instructions  referring  to  one  of
several indexes.  The contents of these indexes will not be
reproduced in this subcourse.
Instead, reference will be
made to the technical manual in which the index can be
found, when needed.
NOTE
During  the  test  procedure,  several  pathways  develop,
depending  on  the  results  obtained  for  individual  tests
being  run.
Not  all  pathways  will  be  covered  in  this
subcourse.  One typical pathway will be used as an example.
When actually performing the test on the vehicle, be sure
to have the TM 9-2350-252-20-2-1 on hand and respond to the
actual test results observed during testing.
a.
Preparing for Test 2700.  Before beginning to run test 2700 on the 25mm and
7.62mm guns, make sure that the STE-M1/FVS is hooked up to the DTP/DCA, the engine
is stopped, the turret is shut down, and the weapons are unloaded and safe.  Then
perform these initial steps:
(1)
Perform message word 044 (TM 9-2350-252-20-2-1, page 3-585) and move the
AP switch to the AP position.
(2)
Perform message word 045 (TM 9-2350-252-20-2-1, page 3-686) and move the
HE switch to the HE position.
NOTE
ABS and HBS switches must be moved without rotating the
turret later in this task.  Note position of switches while
rotating turret to 6400 mils.
(3)
Hook up the STE-M1/FVS teat set to the vehicle distribution box.
146






Western Governors University

< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.