• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > Ordnance Documents and other related manuals > > Figure 62. Connection 2w103P2/2a102J2.
Test  Continuation - Od160870104
Repeating  Test  2730.

The M2/m3 Bradley Fighting Vehicle: Fire Control System
Page Navigation
  92    93    94    95    96  97  98    99    100    101    102  

M2/M3 BFV: FIRE CONTROL SYSTEM - OD1608 - LESSON 2/TASK 3
(b) Next, check the tightness of cable connection 2W101P4 to
2A1J5 (refer to figure 58 on page 90) on the distribution box, and
tighten it if it is loose.
(c) Inspect cable connection 2W103P1 to 2A1044J2 (refer to
figure 60 on page 91).  Tighten the connection if needed.
(d) Inspect  and  tighten,  if  necessary,  the
connection
of
2W10P5 to 2W103J1 (refer to figure 61 on page 92).
(e) Check  and  tighten,  if  needed,  the
cable
connection
2W103P4 to 2A001J3 (refer to figure 57 on page 90).
(f) Also check cable connection 2W103P3 to 2A1001J2 (refer to
figure 57 on page 90) for tightness, and tighten it if it is loose.
(g) Next, check cable connection 2W103P2 to 2A102J2 (figure
62).
Tighten it as needed.
FIGURE 62.
CONNECTION 2W103P2/2A102J2.
97






Western Governors University

< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.