• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print

Home > Ordnance Documents and other related manuals > > Answer Key And Feedback - OD1716A0069
Practice Exercise Cont. - OD1716A0068
Correct Answer and Feedback - OD1716A0070

Troubleshooting ther AN/ GVS-5 Laser Observation Devise Test Set, TS-3620
Page Navigation
  58    59    60    61    62  63  64    65  

LESSON
PRACTICE EXERCISE
ANSWER KEY AND FEEDBACK
Compare your answers to the following solutions.  If you answered any
item  incorrectly,  review  the  page(s)  and  paragraph(s)  referenced
until you understand the instruction.
Item
Correct Answer and Feedback
1.
C.
3.
The front panel provides three jacks for monitoring the LASER
PULSE (J2), the RCVR SYNC PULSE (J3), and the TGT SYNC PULSE
(J4) for use in testing and troubleshooting.  (page 7, para 6)
2.
C.
Organizational.
To determine the maintenance level of a given task, you must
refer to the Maintenance Allocation Chart.
(page 10, figure
1-5)
3.
D.
Millijoules.
The  LR  Tester  measures  the  output  energy  of  the  LR  to
determine sufficient level of output, and lights indicators
LOW OUTPUT (DS3) or NORMAL OUTPUT (DS2).  (page 16, para 2)
4.
B.
PIN diode.
The PIN diode detects the optical energy received and sends a
corresponding electrical charge to two voltage comparators for
measurement.  (page 20, para 1)
5.
D.
R13.
To determine the required voltage measurements, you must refer
to the power supply board voltage label and the power supply
board voltage measurement matrix.  (page 23, figures 1-16 and
1-17)
64
OD1716






Western Governors University

< Previous Page
Index ^
Next Page >

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.